We began work with a Pickens County, SC Chemical Processing client in 2020 by working on column and schedule 10 vent replacements, and are now doing larger B-08 PSV Vent conversions from carbon to stainless and replacing pumps.
Our ASME qualified team of Process Piping experts are often called by this client because they can trust us to take care of their projects, without issue.
Our first chemical process piping job was for their hydro-test area, providing a high-pressure carbon steel setup for their system to allow them to perform cylinder testing. This success led to pump installations consisting of tying in new pumps to their steam generation system.
The original pump had failed, and to get the plant back to efficiency this job was vetted out and given to us based on our prior success and experience. We Installed 200 linear feet of 2” galvanized process piping to replace the old system, and we were also contracted to add new piping for four safety showers with eyewash stations, to maintain safety standards for the plant.
The client has enjoyed working with us and has called JDI to provide emergency repairs on their water treatment system’s lines when the need arises. Their chemical process piping projects have expanded into wastewater piping projects because of our success at understanding their engineering plans. Their plant is running efficiently and is regularly maintained by JDI’s process piping and maintenance team.