Base Wiring & Prepping Light Poles
Kite Hill Lighting Project
Project Overview
The team began by meticulously planning the project materials and crew needs, then site prepping alongside King Asphalt with trenches for the new wiring and conduits. Our electricians then laid the piping and fed the wiring through, creating concrete bases for the poles and the wiring. JDI was also tasked with wiring breaker panels, and making sure everything was neat.
Altogether our team installed 208V single phase wiring through 10,000′ of PVC, four 20 AMP brakers, 36 ground rods, and 50 quazite boxes. The client is very happy with our work and is looking forward to the next project with JDI’s commercial industrial electrician team.
Tasks Included
- 10,000′ of PVC
- (36) 20′ Lighting Poles
- (38) Lighting Instrument Heads
- 208V Single Phase
- (4) 20 AMP Brakers
- (36) Fusible Links & Surge Protectors
- (36) Ground Rods
- (50) Quazite Boxes
- Communications Conduit for Camera Surveillance
Results
JDI, an commercial and industrial electrical contractor, created a lighting system in Clemson University’s parking lot to ensure student safety with reliable visibility.